New Activity
Play Quiz
1. 
AIA stands for the:
A.
Animal Institute of Architects
B.
American Institute of Applications
C.
Americans in Appalachia
D.
American Institute of Architects
2. 
True or False: It is an important role of the A/E during the B/A phase to RECOMMEND AWARD to a particular contractor.
A.
True
B.
False
3. 
Bidding documents may be modified through the use of:
A.
verbal statements
B.
emails
C.
smoke signals
D.
addenda
4. 
Specifications are STARTED during which design phase?
A.
Schematic design phase (SDs)
B.
Design Development phase (DDs)
C.
Construction Documents phase (CDs)
5. 
Which of the following establishes Division numbers (such as Div 01) and Spec Section numbers (such as 03 3000)?
A.
SectionFormat
B.
MasterFormat
C.
FreeFormat
D.
PageFormat
6. 
What Division would Spec Section 09 5100 - Acoustical Ceilings be found in?
A.
01
B.
09
C.
02
D.
00
7. 
Virginia's internet-based, electronic procurement system is called:
A.
eleVAte
B.
eVA
C.
VAProcure
D.
VAonline