New Activity
Play Matching Game
1. Environmental impact
2. Draft
3. DIRECT AREA OF INFLUENCE
4. Criteria for ranking projects
5. ENVIRONMENTAL BASELINE
6. Permanent
7. Environmental Diagnosis of Alternatives
8. Ministry of Environment (1998), the applicant and user (beneficiary of the environmental license has the following responsibilities
9. Environmental zoning

environmental license presented for the same project, several options or alternatives, supported each, geographic location, environmental characteristics, physical, biotic and socio-economic risks and rewards incidental to the project effects and possible solutions and environmental measures

According to the executor

Construction of thematic map for abiotic component developed based on geological, geomorphological, soil and hydrological maps, air quality and noise and climatological information

Road construction.

According to the size.

The actions of man, from birth, generate changes in the environment, changing ecosystems and thus degrading the planet

Comply with the specific obligations set out in resolution approving the environmental license.

One whose effect represents an alteration of environmental factors indefinite in time. (Exceeding 10 years time)

study to characterize the environment in which development of a project to determine the best technical, environmental and economical alternative for the design and execution of it arises

Sites own use and operation of the activity

point where the project and develops a margin determined by environmental factors

the description of environmental components and knowledge of the project demand of natural resources is defined, which allows quantification of resources and defines environmental permits that must be managed for the construction of the project.

the description of the environment where it will develop the project in its abiotic, biotic and socioeconomic and cultural components

Plan that studies conditions, economic, technical, social, of a work or activity to be performed

technical document defining the location or condition and implementation of plans and programs, the realization of buildings or other facilities and work

It also includes sampling of different elements that must be performed by accredited companies to ensure sampling protocols and results.

Provide accurate information in Environmental Studies. (Data, drawings, maps, designs, among others.).

building a base map containing contour lines, hydrographic network, main roads, administrative political division and municipal seats

To fulfill the commitments made in the Environmental Management Plan. (Adopt technologies, etc. implement measures to prevent, mitigate, correct and compensate for the environmental degradation that can produce the project).

where promptly they happen impacts. Some projects refers to the local or specific context

an alteration to the environment that develops over time

repair the damage that occurs in connection with the execution of the project.

According to the area of influence

According to the sector of the economy.