New game
Download
Get Academic Plan
Share game
Froggy Jumps
Froggy Jumps

RCM, FMEA and RCA

Integrate it into your platform

You can integrate the game into an LMS compatible with LTI 1.1 or LTI 1.3 such as Canvas, Moodle, or Blackboard. This way, the scores will be automatically saved into the platform’s gradebook.
Download
You have exceeded the maximum number of games you can integrate into Google Classroom with your current Plan.

To integrate as many games as you want in Google Classroom, you need an Academic Plan or a Commercial Plan.

You have exceeded the maximum number of games you can integrate into Microsoft Teams with your current Plan.

To integrate as many games as you want in Microsoft Teams, you need an Academic Plan or a Commercial Plan.

Downloading games is an exclusive feature for users with an Academic Plan or a Commercial Plan.

Get your Academic Plan or your Commercial Plan now and start integrating your games into your LMS, website or blog.

If you wish, you can download a demo game here and test its integration:

RCM, FMEA and RCA

Froggy Jumps

(1)
Played 220

About this activity

For Quality at Maintenance, Unit 3, TSU Maintenance, 2nd term, UT Cancún. Based on Siddiqui & Daya's "Handbook of Maintenance Management and Engineering", Chapters 4 and 16

Created by

Mexico

Download the paper version to play

Make your own free game from our game creator
Compete against your friends to see who gets the best score in this game

Top Games

%
Anonymous
Anonymous
%
%
%
You have exceeded the maximum number of games you can print with your current Plan.

To print as many games as you want, you need an Academic Plan or a Commercial Plan.

Print your game
RCM, FMEA and RCA
 

Froggy Jumps

RCM, FMEA and RCAOnline version

For Quality at Maintenance, Unit 3, TSU Maintenance, 2nd term, UT Cancún. Based on Siddiqui & Daya's "Handbook of Maintenance Management and Engineering", Chapters 4 and 16

by Kermin Peña
1

Series of background documents developed by United Airlines that detonated in a model document assigned by the U. S. government called "Reliability Centered Maintenance", to establish a preventive maintenance program for Boeing 747.

2

One of the most important findings of the RCM study was that only a small percentage of components exhibited a failure characteristic that justified scheduled complete overhaul or replacement:

3

SAE-JA-1011 was a first attempt to standardize RCM, redefining maintenance functions as thinking about system functions rather than operation of a component, it was developed by:

4

When we apply Reliability Centered Maintenance (RCM) as a systematic approach to define preventive maintenance programs, what do we select to preserve important system functions?

5

What tool is helpful at modeling complex systems identifying major systems composed of simpler ones down to primitive elements?

6

The following documents ensure records on how maintenance tasks were selected and why were those the best possible alternatives at RCM documentation process, except one:

7

In a Failure Modes and Effects Analysis, we use data and knowledge of the process and equipment and rate each potential failure mode and effect to combine in one number the priority of the failure modes identified, commonly known as:

8

The following are main groups of consequences that a failure can exhibit into the system function, as part of the standard RCM methodology, except one:

9

The following are RCM principles, except one:

10

The following are basic tools of quality which could be implemented in a Root Cause Analysis as a technique to investigate a problem, considering, for example, brainstorm sessions of collaborative multidisciplinary teams, except one: