New game
Download
Get Academic Plan
Share game
Integrate it into your platform

You can integrate the game into an LMS compatible with LTI 1.1 or LTI 1.3 such as Canvas, Moodle, or Blackboard. This way, the scores will be automatically saved into the platform’s gradebook.
Download
You have exceeded the maximum number of games you can integrate into Google Classroom with your current Plan.

To integrate as many games as you want in Google Classroom, you need an Academic Plan or a Commercial Plan.

You have exceeded the maximum number of games you can integrate into Microsoft Teams with your current Plan.

To integrate as many games as you want in Microsoft Teams, you need an Academic Plan or a Commercial Plan.

Downloading games is an exclusive feature for users with an Academic Plan or a Commercial Plan.

Get your Academic Plan or your Commercial Plan now and start integrating your games into your LMS, website or blog.

If you wish, you can download a demo game here and test its integration:

PERT y CPM: Control de Proyectos

Yes or No

Played 2

About this activity

Verdad/falso sobre PERT y CPM

Created by

Mexico

Download the paper version to play

Make your own free game from our game creator
Compete against your friends to see who gets the best score in this game

Top Games

%
Anonymous
Anonymous
%
%
%
You have exceeded the maximum number of games you can print with your current Plan.

To print as many games as you want, you need an Academic Plan or a Commercial Plan.

Print your game
PERT y CPM: Control de Proyectos
 

PERT y CPM: Control de ProyectosOnline version

Verdad/falso sobre PERT y CPM

by victor
1

La estimación más probable es la única que se usa para calcular la duración total en PERT.

2

PERT y CPM no pueden coexistir en el mismo proyecto.

3

En PERT se estiman las duraciones de las actividades con probabilidades y medias probabilísticas.

4

PERT utiliza tres estimaciones de tiempo: optimista, más probable y pesimista.

5

La flotación total es igual a la duración de la actividad.

6

La ruta crítica es la secuencia de actividades sin flotación que determina la duración total del proyecto.

7

CPM se basa en tiempos determinísticos para calcular la ruta crítica.

8

La flotación total de una actividad es la diferencia entre su ES/EF y LS/LF.

9

En CPM, la ruta crítica nunca cambia durante la ejecución.

10

En PERT solo se usa la estimación pesimista para calcular las duraciones.