New game
Download
Get Academic Plan
Share game
Integrate it into your platform

You can integrate the game into an LMS compatible with LTI 1.1 or LTI 1.3 such as Canvas, Moodle, or Blackboard. This way, the scores will be automatically saved into the platform’s gradebook.
Download
You have exceeded the maximum number of games you can integrate into Google Classroom with your current Plan.

To integrate as many games as you want in Google Classroom, you need an Academic Plan or a Commercial Plan.

You have exceeded the maximum number of games you can integrate into Microsoft Teams with your current Plan.

To integrate as many games as you want in Microsoft Teams, you need an Academic Plan or a Commercial Plan.

Downloading games is an exclusive feature for users with an Academic Plan or a Commercial Plan.

Get your Academic Plan or your Commercial Plan now and start integrating your games into your LMS, website or blog.

If you wish, you can download a demo game here and test its integration:

BIM vs Tradición: Construcción Digital

Yes or No

Played 19

About this activity

Diferencia BIM vs método tradicional

Created by

Spain

Download the paper version to play

Make your own free game from our game creator
Compete against your friends to see who gets the best score in this game

Top Games

%
Anonymous
Anonymous
%
%
%
You have exceeded the maximum number of games you can print with your current Plan.

To print as many games as you want, you need an Academic Plan or a Commercial Plan.

Print your game
BIM vs Tradición: Construcción Digital
 

BIM vs Tradición: Construcción DigitalOnline version

Diferencia BIM vs método tradicional

by CARMEN BARGUES
1

Al cambiar una pared en BIM se actualiza todo automáticamente.

2

Los errores en obra con BIM alcanzan un 25%.

3

En BIM, cada cambio genera un presupuesto completamente nuevo desde cero.

4

En BIM no dibujas líneas; construyes digitalmente el edificio.

5

En BIM se crea un elemento real con datos.

6

En el método tradicional dibujas líneas para cada pared y todo se actualiza automáticamente.

7

En BIM un cambio pequeño tarda alrededor de 2 minutos.

8

En BIM siempre hay que dibujar primero las paredes en 2D antes de construir en 3D.

9

En BIM los errores en obra son del 3%.

10

Cambiar la altura del forjado de 25 cm a 20 cm en BIM toma unas 8 horas de trabajo.