New game
Download
Get Academic Plan
Share game
Integrate it into your platform

You can integrate the game into an LMS compatible with LTI 1.1 or LTI 1.3 such as Canvas, Moodle, or Blackboard. This way, the scores will be automatically saved into the platform’s gradebook.
Download
You have exceeded the maximum number of games you can integrate into Google Classroom with your current Plan.

To integrate as many games as you want in Google Classroom, you need an Academic Plan or a Commercial Plan.

You have exceeded the maximum number of games you can integrate into Microsoft Teams with your current Plan.

To integrate as many games as you want in Microsoft Teams, you need an Academic Plan or a Commercial Plan.

Downloading games is an exclusive feature for users with an Academic Plan or a Commercial Plan.

Get your Academic Plan or your Commercial Plan now and start integrating your games into your LMS, website or blog.

If you wish, you can download a demo game here and test its integration:

PCS2: Special Pre-Midterm Exam (Part 2)

Yes or No

Played 5 %Accuracy 56 Average time 02:55

About this activity

This exam consists of 25 scenario-based Yes/No questions designed to test your ability to apply course concepts, standards, and regulations to practical engineering and construction situations. Read each scenario carefully and decide whether the described action, condition, or statement follows established principles, codes, or requirements. Good luck, God bless and enjoy!

Created by

Philippines

Download the paper version to play

Make your own free game from our game creator
Compete against your friends to see who gets the best score in this game

Top Games

%
Anonymous
Anonymous
%
%
%
You have exceeded the maximum number of games you can print with your current Plan.

To print as many games as you want, you need an Academic Plan or a Commercial Plan.

Print your game
PCS2: Special Pre-Midterm Exam (Part 2)
 

PCS2: Special Pre-Midterm Exam (Part 2)Online version

This exam consists of 25 scenario-based Yes/No questions designed to test your ability to apply course concepts, standards, and regulations to practical engineering and construction situations. Read each scenario carefully and decide whether the described action, condition, or statement follows established principles, codes, or requirements. Good luck, God bless and enjoy!

by Elmaflor Laurejas
1

Scenario: Detailed quantity estimation and final design are part of the preliminary design stage.

2

Scenario: Design documents include a schedule of doors and windows as part of architectural deliverables. Is this a required document?

3

Scenario: Survey records can be modified by field staff without formal review or approval from a licensed Geodetic Engineer.

4

Scenario: Design documents include a Site Development Plan as part of pre-building design activities. Is this a required step?

5

Scenario: Topographic surveys only need to map ground levels and do not require marking existing utilities or property boundaries.

6

Scenario: The Philippine Green Building Code is referenced alongside other codes for a new public school design. Is this a required referral code?

7

Scenario: A detailed engineering survey may be skipped for small residential projects to save time and cost.

8

Scenario: Crashing a project schedule always reduces total project cost by cutting activity durations.

9

Scenario: An as-built survey is conducted before construction begins to confirm proposed site layout.

10

Scenario: Gusset plates are omitted from all truss connection details to save cost. Is this acceptable practice?

11

Scenario: Dead load calculations include the weight of fixed plumbing fixtures and ceiling finishes. Is this included correctly?

12

Scenario: Engineering surveys are only needed during the construction phase of a project.

13

Scenario: A proposed 2-storey school building will be designed without conducting soil boring tests. Is this compliant with NSCP 2015 requirements?

14

Scenario: Benchmarks used for vertical control should be permanent, stable, and located outside the construction impact zone.

15

Scenario: Wind load design for a standard building uses only the Simplified Procedure without site validation. Is this an allowed method per NSCP 2015?

16

Scenario: Loose, water-saturated sand on flat ground is highly vulnerable to liquefaction during strong earthquakes.

17

Scenario: You recommend constructing a residential subdivision directly on an old landslide site.

18

Scenario: You place a sharp horizontal curve immediately after a long straight tangent to follow the land shape.

19

Scenario: It is acceptable to use estimated distances instead of precise measurements when preparing project alignment plans.

20

Scenario: CHB walls are anchored to columns using vertical and horizontal dowels. Is this the correct connection method?

21

Scenario: BP 344 (Accessibility Law) is referenced when designing ramps and accessible entrances for a public office building. Is this the correct law to apply?

22

Scenario: Pre-planning should be done only by head office staff and shared with site teams once complete.

23

Scenario: Horizontal control surveys only use temporary markers that may be removed once the design phase is complete.

24

Scenario: Effective decision-making should start with compromise to keep all parties satisfied quickly.

25

Scenario: Pre-construction surveys help detect discrepancies between proposed design plans and actual site conditions.