Log in
New Activity
Types of activities
Support center
Enter your Game Pin
Blog
Premium
English
Español
Français
New Activity
Log in
All the activities
Play Quiz
Print Quiz
Waterfall SDLC Quiz
Author :
hend.negm@nbcc.ca
1.
What is the first phase of the Waterfall SDLC?
A.
Testing
B.
Requirements Analysis
C.
Implementation
D.
Design
2.
In which phase is the software actually built in Waterfall SDLC?
A.
Implementation
B.
Design
C.
Maintenance
D.
Requirements Analysis
3.
What is a key characteristic of the Waterfall model?
A.
Continuous feedback
B.
Sequential phases
C.
Iterative cycles
D.
Agile development
4.
Which phase follows the Design phase in Waterfall SDLC?
A.
Implementation
B.
Maintenance
C.
Requirements Analysis
D.
Testing
5.
What is the main focus during the Testing phase?
A.
Designing architecture
B.
Deploying software
C.
Gathering requirements
D.
Identifying defects
6.
What happens if changes are needed after the Testing phase?
A.
Start a new project
B.
Implement without changes
C.
Go back to earlier phases
D.
Skip to Maintenance
7.
Which of the following is NOT a phase in the Waterfall model?
A.
Support
B.
Maintenance
C.
Requirements Analysis
D.
Design
8.
What is a disadvantage of the Waterfall model?
A.
Continuous integration
B.
Fast delivery
C.
High adaptability
D.
Inflexibility to changes
9.
What is the primary output of the Requirements Analysis phase?
A.
Requirements Specification Document
B.
Design Document
C.
User Manual
D.
Test Plan
10.
Which phase includes user acceptance testing?
A.
Implementation
B.
Design
C.
Testing
D.
Requirements Analysis